In Saudi Arabia, a lightweight slurry program was used to avoid losses throughout cementing and maintain very well integrity. Browse circumstance analyze. Figure seven reveals the stress and velocity cloud map from the coupled wellbore–fracture system in the intervening time of loss. The pressure inside the drill pipe and annulus doesn't a